OEE, takt, capacity, capability, Gage R&R, SPC, scrap, cost-per-part, SMED, and the AIAG paperwork trio — ten workbooks built to one professional standard, each pre-loaded with a worked automotive example. Open, overwrite, done.
See the tools Get all ten for $129Every tool: no macros, no add-ins, nothing to install. Locked formulas so nobody breaks it, unlocked yellow inputs so everybody can use it.

Measure OEE, log it daily, and see where the downtime really goes.

Set the drumbeat from demand, then balance the work to hit it.

Demand and cycle times in — required hours, loading, and buy/no-buy answers out.

From raw measurements to a capability verdict in one paste.

X̄-R, I-MR, and p-charts with limits and rule violations built in.
Log scrap where it happens — the Pareto shows where the money goes.

Defensible machine rates and part costs — for quotes and business cases.

The AIAG paperwork trio, linked — enter your process once.
Everything above ($320 bought separately) in one download, plus every future update to every tool.
The quick-answer editions — free, no strings beyond an email. They do the single calculation; the paid versions do the whole study.
No download, no email — the math runs right in your browser.
These tools are built and maintained by a working automotive manufacturing engineering manager with operations experience — the same spreadsheets, methods, and AIAG paperwork used to launch and run real production lines. Every formula is verified against an independent reference implementation before a tool ships. If a tool doesn't hold up on your floor, reply to your receipt and say so.